We provided support to an EPC contractor for an onshore/offshore NLNG project in Nigeria, contributing to the technical and operational management of activities throughout all development phases.

Client/Industry

Oil & Gas

Year

2021

Service

Compliance

NLNG onshore/offshore project
01

Scenario

The project involved the expansion of an existing NLNG infrastructure located on Bonny Island, through a significant operational upgrade of both onshore and offshore facilities, along with the extension of onshore facilities dedicated to the new plant's operational staff. The initiative aimed to increase production capacity and generate added value by expanding the NLNG complex with a new train and a new common liquefaction unit, designed to collect excess treated gas from existing trains and convert it into LNG. The project also included the construction of a new export jetty and a new berth, including related loading infrastructure and ship vapor recovery systems. The existing power plant and main support systems—such as demineralized water, instrument air, inert gas, drainage, and fire-fighting systems—were expanded, in addition to debottlenecking the current flare systems and installing new flare systems for the CT/CLU.

02

Solution

As part of our support services, we assisted in preparing the documentation required for project activities.

03

Activities

  • Preparation of the Environmental Management Plan, defining the guiding principles for the proper management of environmental issues related to preliminary EPC works.
  • Preparation of the Environmental Monitoring Plan for Early Works activities, both onshore and offshore, considering the main environmental components: air, water, soil, subsoil, noise, and marine sediments.
  • Definition of environmental regulatory compliance criteria applicable to the project, ensuring adherence to regulatory standards and industry best practices.